Skip to main content
Historic England

Conservation area

There is a problem

  • entry-date column must be in YYYY-MM-DD format

Leigh Bridge

reference
162
name
Leigh Bridge
designation-date
1989-12-20
document-url
https://www.wigan.gov.uk/Docs/PDF/Resident/Planning-and-Building-Control/Conservation-areas/Leigh-Bridge.pdf
documentation-url
https://www.wigan.gov.uk/Resident/Planning-and-Building-Control/Planning/Conservation-trees-and-hedges/Conservation-areas.aspx
geometry
MULTIPOLYGON (((-2.520213 53.494954,-2.520572 53.494993,-2.520592 53.495001,-2.521245 53.495064,-2.521333 53.495082,-2.521646 53.495105,-2.521645 53.494983,-2.521801 53.494627,-2.522064 53.494619,-2.522199 53.494344,-2.522669 53.494357,-2.523192 53.494434,-2.523293 53.494309,-2.523360 53.494204,-2.523175 53.494164,-2.523249 53.494040,-2.520642 53.493505,-2.520774 53.493232,-2.520365 53.493155,-2.520206 53.493429,-2.520232 53.493476,-2.520215 53.493504,-2.520237 53.493519,-2.520145 53.493657,-2.520104 53.493665,-2.519674 53.493610,-2.519403 53.493587,-2.519384 53.493615,-2.518689 53.493460,-2.518272 53.493376,-2.516345 53.492917,-2.516231 53.493167,-2.516147 53.493396,-2.516530 53.493485,-2.516515 53.493509,-2.516606 53.493531,-2.516622 53.493507,-2.516972 53.493588,-2.517063 53.493599,-2.517875 53.493834,-2.518149 53.493881,-2.518140 53.493903,-2.518958 53.494029,-2.518951 53.494045,-2.518972 53.494063,-2.519196 53.494095,-2.519064 53.494410,-2.519555 53.494479,-2.519526 53.494562,-2.519543 53.494576,-2.519615 53.494594,-2.519617 53.494588,-2.519762 53.494614,-2.519683 53.494744,-2.519996 53.494804,-2.520011 53.494859,-2.520039 53.494894,-2.520188 53.494924,-2.520213 53.494954)))
point
POINT (-2.520054 53.49402)
notes
Best Map is shown on page 4 of the appraisal document.
organisation
entry-date

entry-date must be a real date

2025-04-01
start-date
1989-12-20
end-date

How to fix this issue

Your dataset is missing the entry-date column.

The Conservation area guidance explains how to fix the issue:

entry-date

The date the record was last updated.

If the entity has never been updated, enter the same date as start-date.

Write in YYYY-MM-DD format.

Example:

2022-12-20

With dates, some data is better than no data, so:

  • 2022 is fine
  • 2022-12 is better
  • 2022-12-20 is brilliant

How to improve Historic England’s data

  1. Fix the errors indicated
  2. Use the check service to make sure the data meets the standard
  3. Publish the updated data on the endpoint URL